Royal Devon and Exeter Hospital – Energy Centre

EX2 Group successfully delivered a £10 million electrical infrastructure upgrade at the Royal Devon and Exeter Hospital (Wonford), one of the South West’s leading acute NHS hospitals. Delivered over a five-year programme, the project transformed the site’s HV and LV electrical systems, significantly improving power resilience, capacity and operational reliability.

Working within a fully operational live hospital environment, EX2 replaced the existing 11kV HV transformers, installed three new 2MVA backup generators, and modernised the hospital’s LV distribution network, including high-capacity switchboards and cast resin busbar systems. Extensive enabling works were completed to maintain continuous power to critical clinical services throughout the programme.

As Principal Contractor, EX2 developed the design from RIBA Stage 4i through to Stage 5, using BIM, point cloud surveys and Autodesk Revit models to minimise risk and disruption. The project was delivered in collaboration with Hoare Lea and Ward Williams, following BSRIA Soft Landings principles.

The upgrade provides the hospital with future-proof electrical infrastructure, improved protection for critical medical equipment, and the capacity to support expanding healthcare services and new medical technologies — helping ensure reliable, uninterrupted patient care for the local community.

Client

Royal Devon University Healthcare NHS Trust

Main Contractor

EX2 Group

Project Budget

£10m

Timescale:

5 years

Works Undertaken:

Four new HV 11kV transformers
Replace back-up generator systems with three 2MVA generators
Installation of over 5km of 240mm tri rated Ho7 temporary cable
Provision temporary HV transformers and generators
Temporary scaffolding and structures
Two 6300-amp generator switchboards and four 3200-amp switchboards
Cast resin busbar systems
New primary containment
Replacement submain cabling
Construction of a new steel-framed generator switch room
Construction of a maintenance walkway
Relocation of medical gas manifold rooms
Repositioning of high temperature heating pumps

More Case Studies

See all
Healthcare

Langdon LDA Unit

Healthcare

Hybrid Theatre

Healthcare

D2/E2 Cardiology Unit, RD&E Hospital

Go to home

EX2 Group Ltd.
Unit 4 Splatford Barton Business Park,
Splatford, Kennford, Exeter.
Devon EX6 7BT

contact@ex2-group.com
01392 308570

  • Welcome to three new Exeter College apprentices

  • EX2 Group Begins Renewable Energy Install at Quayside Leisure Centre

  • Electrical
  • Compliance
  • Eco-Tech
  • M&E Engineering
  • Site Map
  • Terms and Conditions
  • Privacy Policy
  • About
    • Why Us
    • Accreditations
    • Our People
    • News
    • Sustainability
    • Careers
  • Services
    • Electrical
    • Compliance
    • M&E Engineering
    • Eco-Tech
  • Projects
    • Commercial
    • Eco-Tech
    • Education
    • Healthcare
    • Industrial
    • Leisure
  • Contact