EX2 carried out the supply and installation of a replacement switch panel and 200Kva generator at Bowmoor House, part of the Royal Devon and Exeter Hospital. We also renewed the incoming main electrical supply.
It was important to carry out the works while the building was unoccupied. As such, we needed to carefully plan out the timings and logistics, and install temporary power provision to ensure the works caused minimum disruption.