Forde House, the headquarters of Teignbridge District Council, was identified as one of the council’s highest carbon-emitting buildings. In a drive toward sustainability and carbon neutrality, the council secured a £672,000 grant to undertake comprehensive decarbonisation works, with EX2 Group leading the electrical and mechanical engineering work.
EX2 Group mechanical engineers designed and installed a modern hybrid air source heat pump system, fully replacing the outdated gas boiler infrastructure. The installation of a state-of-the-art energy management system and clean air ventilation improved comfort and air quality for building staff.
Our EcoTech division enhanced the building’s efficiency with the installation of energy-efficient LED lighting and an extensive 75.6 kWp solar PV generation system. The solar panels were installed across a complex, multi-faced pitched slate roof. This presented a unique technical challenge, which our team overcame by engineering a bespoke mounting system using precision hooks and rails – ensuring both stability and protection of roof drainage.