EX2 carried out the supply and installation of replacement switch panel, 200Kva generator and renewed incoming main electrical supply.
RD&E Hospital Heavitree – Switchgear replacement
With the existing switchgear reaching the end of life and to reduce the ongoing risk of failure and disruption to critical hospital operations it was necessary to replace the main switch panel serving the hospital.
RD&E Hospital Wonford – Switchgear replacement
With the existing panel suffering from parts failure and reaching the end of the life it was necessary to replace the switchgear feeding a number of outlying buildings across the main hospital site.
Clyst Ward refurbishment
With a rare opportunity to take advantage of a decanted ward a fast track refurbishment project was undertaken.
CSRC Refurbishment – Heavitree Hospital
CSRC Refurbishment – Heavitree HospitalHealthcareProject OverviewEX2 successfully delivered the electrical works as part of the Clinical Skills Centre Conversion project, transforming the ground floor CSRC facility and lower ground RDE store areas into the College of Medicine and Health at Heavitree Hospital. The project involved the reconstruction of the extensive multi-room Clinical Skills Training wing, which houses state-of-the-art electronic patient … Read More
Gladstone Building – Heavitree Hospital
This scheme consisted of internal alteration and refurbishment works to provide new office accommodation with ancillary support spaces at Heavitree Hospital.
Brookfield Farm – Vetinary Centre
This specially designed veterinary facility provides start of the art facilities this included a operation theatres, recovery bays and stables for the donkeys.
Derriford Hospital – Bracken Ward
The extension and refurbishment of Bracken Ward. The works entailed remodelling existing spaces to incorporate new shower rooms and larger bed ward areas.