EX2 undertook the design and installation of the electrical services associated with the refurbishment of a lecture theatre and teaching spaces for the University of Exeter.
The team carried out a range of works in the university’s Laver Building, including data networking, mains distribution, and AV containment. We carefully designed the AV services to ensure that works could be installed within the limited ceiling spaces.
Client:
University of Exeter
Main Contractor:
Morgan Sindall
Project Budget:
£30,000
Timescale:
3 Months
Works Undertaken:
- Mains Distribution
- Lighting Controls
- Lighting
- Small Power
- Fire Alarm
- AV Containment
- Data Networking