Taw View offices – Barnstaple

Featured Image

Taw View offices – Barnstaple

Commercial

Project Overview

Print Friendly, PDF & Email

Over a 20-week period, we helped refurbish Taw View Offices in Barnstaple, creating a more effective internal layout. The building’s new floorplan includes two open-plan offices on the first and second floors, with meeting rooms, break-out spaces, audio booths and standing desks.

The ground floor now consists of reception and FM offices, a café, meeting rooms and other ancillary spaces.

Where possible, we incorporated sustainable measures into the design. We included highly-efficient heat recovery ventilation, luminaires and controls, and a Building Management System to ensure operations going forward are as energy-efficient and comfortable as possible for the building’s occupants.

Client:

Devon County Council

Main Contractor:

Midas Construction

Consultant Engineer:

HBS

Project Budget:

£1.2m

Timescale:

20 Weeks

Works Undertaken:

  • Mains Distribution
  • Small Power
  • Networked lighting control
  • Lighting and Emergency Lighting
  • Fire Alarm
  • Refuge Alarm
  • Access Control
  • Security Alarm
  • CCTV
  • LTHW Heating
  • Domestic Services
ImageImage
Image
Image
Image
Image
Image

    Related Case Studies