Project Overview

After a fire devastated the nightclub a full refurbishment was required to enable the club to be restored to its former glory. To make the most of the exposed brickwork a galvanised containment system was installed to serve both power and lighting. Due to the nature of the venue a full stage lighting infrastructure was provided complete with dedicated power supplies.

  • Client:Cavern Nightclub
  • Main Contractor:Arque
  • Consultant Engineer:EDP
  • Project Budget:£40,000
  • Timescale:8 weeks
  • Works Undertaken:
    • Mains Distribution
    • Galvanised containment
    • Small Power
    • Lighting and Emergency Lighting
    • Data Networking
    • Stage Lighting infrastructure