PROJECTS

CLIENT

Royal Devon & Exeter Foundation Trust

MAIN CONTRACTOR

EX2 Electrical

PROJECT BUDGET

£125,000

TIMESCALE

1 month

WORKS UNDERTAKEN

  • Upgraded utility supply
  • Temporary power provision
  • Replacement switch panel
  • Replacement generator

Project Overview

Bowmoor House - Replacement switchgear and generator

EX2 carried out the supply and installation of replacement switch panel, 200Kva generator and renewed incoming main electrical supply. The works were carefully planned to ensure that the works were carried out with minimum interruption to the building and required the works to be carried out whilst the building was unoccupied.

bowmoor 4.jpeg bowmoor 5.jpeg IMG_6286.JPG bowman.JPG

CLIENT

Plymouth City Council

MAIN CONTRACTOR

SWH Civils

PROJECT BUDGET

£150,000

TIMESCALE

6 months

WORKS UNDERTAKEN

  • Electrical Design
  • LED Deck lighting
  • LED Decorative lighting
  • Containment
  • Mains Distribution
  • Lighting Controls
  • Data Networking

Project Overview

Laira Rail Bridge - Plymouth

EX2 carried out the design, supply, installation and commissioning of the electrical and lighting services for the refurbishment of the Liara Rail bridge in Plymouth. Working closely with Philips lighting we developed a scheme that complimented the structure of the bridge.

Containment and electrical services were carefully coordinated with the existing structure and the installation sequence and method carried out to ensure that the works completed in conjunction with the specialist steel work contractor refurbishment works.

DSC_0206_7_8.jpg DSC_0221_2_3.jpg DSC_0255.jpg

CLIENT

Devon County Council

MAIN CONTRACTOR

Midas Construction

PROJECT BUDGET

£80,000

TIMESCALE

6 months

WORKS UNDERTAKEN

  • Underfloor Heating
  • Natural Ventilation
  • Gas Installation
  • Mains Distribution
  • Lighting Controls
  • Lighting (Internal & External)
  • Data Networking
  • Intruder & Fire Alarm
  • Small Power
  • Lightning Protection

Project Overview

Sidmouth College – New Maths Block

EX2 carried out the mechanical and electrical services to the new teaching block at Sidmouth College. The building is provided with natural ventilation, underfloor heating and a high efficiency boiler coupled with high efficiency lighting. This means that the building is highly efficient and ensures that the building provides a great addition to the facilities of the college and provides students and staff with a first class environment to work within.

DSC_0142_3_4.jpgDSC_0136_7_8.jpgDSC_0073_4_5.jpg

CLIENT

South Hams District Council

MAIN CONTRACTOR

Integral

PROJECT BUDGET

£275,000

TIMESCALE

18 months

WORKS UNDERTAKEN

  • Mains Distribution
  • Lighting Controls
  • Lighting (Internal & External)
  • Data Networking
  • Fire Alarm (whole site)
  • Small Power
  • Standby Generator

Project Overview

Follaton House - Totnes

EX2 carried out the electrical works associated with the refurbishment of existing office accommodation and reception areas. The remaining areas of the building remained occupied during the works so essential infrastructure upgrade works had to be carried out with minimal disruption to occupants. As part of the works the fire alarm system to the entire site was also replaced after we were able to demonstrate our ability to work within occupied areas with minimal disruption.

DSC_0061_2_3.jpg DSC_0107_8_9.jpg DSC_0076_7_8.jpg

CLIENT

Diocese of Exeter

MAIN CONTRACTOR

Bovey Construction

PROJECT BUDGET

£45,000

TIMESCALE

4 months

WORKS UNDERTAKEN

  • Mains Distribution
  • Lighting Controls
  • Lighting (Internal & External)
  • BMS Controls
  • Small Power
  • MICC Cabling

Project Overview

St Michaels Church - Alphington

Working with a listed building brought a unique set of challenges to ensure that the building was sympathetically modernised with the addition of a new mezzanine floor to create much needed community space. EX2 carefully adapted the existing MICC cabling to retain the services to existing parts of the building unaffected by the works whilst at the same time installing new services to the modernised parts of the building.

DSC_0349_50_51.jpgDSC_0331_2_3.jpg

CLIENT

Teignbridge District Council

MAIN CONTRACTOR

SWH Build

PROJECT BUDGET

£150,000

TIMESCALE

6 months

WORKS UNDERTAKEN

  • Electrical Design
  • Mains Distribution
  • Lighting Controls
  • Lighting (Internal & External)
  • Small Power
  • Photovoltaics Installation
  • Fire & Intruder Alarm

Project Overview

Broadmeadow Employment Units

Broadmeadow Employment units are a new development of mixed use commercial space. The units incorporate a modern theme whilst maintaining a high standard of quality. The flexible buildings offer; Light industrial units, trade counters and offices of various sizes. EX2 where employed to carried out the design and installation of the electrical services and associated PV installation. 

DSC_0031_2_3.jpgDSC_0022_3_4.jpg

CLIENT

Wessex Reserve Forces' and Cadets' Association

MAIN CONTRACTOR

Morgan Sindall

PROJECT BUDGET

£165,000

TIMESCALE

5 Months

WORKS UNDERTAKEN

  • Mains Distribution
  • Lighting Controls
  • Lighting (Internal & External)
  • Small Power
  • Fire & Intruder Alarm
  • Data Network
  • Lightning Protection
  • LTHW Heating
  • Domestic Services
  • Ventilation

Project Overview

Marine Academy Joint Forces Cadet Centre

EX2 undertook the complete electrical and mechanical services for the new Joint Forces Cadet Centre. The works were delivered to the MODs exacting standards and delivered on time and to budget. 

DSC_0152_3_4.jpgDEP_0037.jpg
cadet.jpg

CLIENT

University of Exeter

MAIN CONTRACTOR

Morgan Sindall

PROJECT BUDGET

£30,000

TIMESCALE

3 Months

WORKS UNDERTAKEN

  • Mains Distribution
  • Lighting Controls
  • Lighting 
  • Small Power
  • Fire Alarm
  • AV Containment
  • Data Networking

Project Overview

EX2 undertook the design and installation of the electrical services associated with the refurbishment of a lecture theatre and teaching spaces for the University of Exeter. Careful design integration with the AV services were required to ensure that works could be installed within the limited ceiling spaces.